Click on the links below for guidelines, procedures and forms.
To request an inspection, please contact the Engineering Department at least 48 hours in advance at (909) 888-8986.
Inspection Procedures (PDF)
Water and Sewer Inspection Payment Application (PDF)
The following guidelines provide an overview of the plan requirements necessary to complete an efficient and accurate review of submitted plans.
Plan Guidelines (PDF)
Water and Sewer Plan Check Payment Application (PDF)
The following guidelines were developed to assist in backflow installation.
Backflow Installation and Requirements (PDF)
During a drought emergency, the following restrictions apply to construction projects.
Drought Emergency Construction Restrictions (PDF)
Sewer and Water Availability Request Form (PDF)
Application for Temporary Fire Hydrant Meter & Water Service (PDF)
Flow Test Request Form (PDF)
Engineering Services Preliminary Water Design Deposit Payment Application (PDF)